In order to ensure the normal operation of the wireless communication system, the communication antenna is generally placed at a point to increase the signal coverage radius of the communication antenna to achieve the desired communication effect. In urban residential buildings, office buildings, and office buildings to build communication base stations, communication antennas are generally used to increase the height of antennas, antenna poles or antenna towers, so the antenna heightening has an important role in the communication network system. The national standard communication sold by Xiangyue Tower Over the years, the tower and antenna booster series products have received unanimous praise and praise from China Mobile, China Unicom, and China Telecom. The elevated rack produced by Xiangyue enjoys a high reputation in the industry.Height: 6-15 metersQuality of Hot-dip galvanizing is one of our strength, Our CEO Mr. Lee is an expert in this field with reputation in Western-China. Our team has vast experience in HDG process and especially good at handling the tower in high corrosion areas. Galvanized standard: ISO:1461-2002.
Item
Thickness of zinc coating
Strength of adhesion
Corrosion by CuSo4
Standard and requirement
≧86μm
Zinc coat not be stripped and raised by hammering
4 times
prototype tower assembly is a very traditional but effective way to inspect whether the detail drawing is correct. In some cases, clients still want to do prototype tower assembly to ensure the detail drawing and fabrication is OK. Hence, we still provide prototype tower assembly service for free to customers.In prototype tower assembly service, X.Y. Tower makes commitment:• For each member, the length, position of holes and interface with other members will be checked accurately for proper fitness;• Quantity of each member and bolts will be carefully checked from the bill of materials when assembling the prototype;• Drawings and bill of materials, sizes of bolts, fillers etc. will be revised if any mistake is found.We are so glad that our clients to visit our factory and inspect the product. It is a great chance for both sides to know each other better and strengthen cooperation.For our clients, we will receive you at Airport and provide 2-3 days accommodation.Every piece of our products is coded according to the detail drawing. Every code will be put a steel seal on each piece. According to the code, clients will clearly know a single piece belong to which type and segments.All the pieces are properly numbered and packaged through the drawing which could guarantee no single piece missing and easily to be installed.ShipmentNormally, the product will ready in 20 working days after deposit. Then the product will take 5-7 working days to arrive at Shanghai Port.For some countries or regions, like Central Asia, Myanmar, Vietnam etc., China-Europe freight train and carriage by land may be two better options of transportation.
12m telecommunication tower adjustment
X.Y. Tower has a very strict test protocol to ensure all products we fabricate is quality. The following process is applied in our production flow.Sections and Plates1. Chemical composition (Ladle Analysis)2. Tensile Tests3. Bend TestsNuts and Bolts1. Proof Load test2. Ultimate Tensile Strength test3. Ultimate tensile strength test under eccentric load4. Cold bend test5. Hardness test6. Galvanizing testAll the test data are recorded and will be reported to the management. If any flaws are found, the product will be repaired or scraped directly.